Systematic Procedures to Determine Incentive/disincentive Dollar Amounts for Highway Transportation Construction Projects

Systematic Procedures to Determine Incentive/disincentive Dollar Amounts for Highway Transportation Construction Projects
Author :
Publisher :
Total Pages : 64
Release :
ISBN-10 : LCCN:2009943701
ISBN-13 :
Rating : 4/5 ( Downloads)

Book Synopsis Systematic Procedures to Determine Incentive/disincentive Dollar Amounts for Highway Transportation Construction Projects by : Jae-Ho Pyeon

Download or read book Systematic Procedures to Determine Incentive/disincentive Dollar Amounts for Highway Transportation Construction Projects written by Jae-Ho Pyeon and published by . This book was released on 2012 with total page 64 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Federal Highway Administration has encouraged state transportation agencies to implement Incentive/Disincentive (I/D) contracting provisions for early project completion. Although general guidelines to determine the I/D dollar amount for a project are available, there is no systematic and practical tool in use to determine optimum I/D dollar amounts for I/D projects considering road user cost, agency cost, contractor acceleration cost, and contractor cost savings. Therefore, systematic procedures and models to assist project planners and engineers in determining an appropriate I/D dollar amount are essential to optimizing the use of I/D contracting techniques. This research performed a literature review related to the determination of daily I/D dollar amounts. Caltrans I/D project data were then collected and evaluated. Project performance data were analyzed with regard to project outcomes in two key areas: project time and project cost. Statistical analyses were performed to identify the impact of I/D dollar amount on project time and cost performance. Using Construction Analysis for Pavement Rehabilitation Strategies (CA4PRS) software, Caltrans I/D projects were analyzed to introduce three different levels of CA4PRS implementations for the I/D dollar amounts calculation. Based on the results of the I/D project case studies, the systematic procedures to determine appropriate I/D dollar amounts were developed using the CA4PRS schedule-traffic-cost integration process for the new I5 rehabilitation project in LA. The proposed procedures were applied to a typical highway pavement rehabilitation project using HMA (hot mix asphalt) materials. Further research is needed to apply the proposed model to other types of highway projects, with adjustment for the type of project.

Systematic Procedures to Determine Incentive/disincentive Dollar Amounts for Highway Transportation Construction Projects Related Books

Systematic Procedures to Determine Incentive/disincentive Dollar Amounts for Highway Transportation Construction Projects
Language: en
Pages: 64
Authors: Jae-Ho Pyeon
Categories: Incentives in industry
Type: BOOK - Published: 2012 - Publisher:

GET EBOOK

The Federal Highway Administration has encouraged state transportation agencies to implement Incentive/Disincentive (I/D) contracting provisions for early proje
Optimal Incentive/Disincentive Determination Between Cost and Benefit
Language: en
Pages:
Authors: Piyush Sharma
Categories:
Type: BOOK - Published: 2013 - Publisher:

GET EBOOK

In an effort to motivate contractors to complete construction projects early on high-impact highway pavement construction projects, state transportation agencie
Estimating User Costs as a Basis for Incentive/disincentive Amounts in Highway Construction Contracts
Language: en
Pages: 70
Authors: James S. Gillespie
Categories: Road construction contracts
Type: BOOK - Published: 1998 - Publisher:

GET EBOOK

The Virginia Department of Transportation (VDOT) occasionally includes an incentive/ disincentive for early completion (I/D) in its construction contracts. This
Time-related Incentive and Disincentive Provisions in Highway Construction Contracts
Language: en
Pages: 76
Authors: Gary J. Fick
Categories: Business & Economics
Type: BOOK - Published: 2010 - Publisher: Transportation Research Board

GET EBOOK

This report will be of interest to state and local highway agency construction managers and contractors with regard to learning about best practices of time-rel
Decision-support Framework for Quantifying the Most Economical Incentive/disincentive Dollar Amounts for Critical Highway Pavement Rehabilitation Projects
Language: en
Pages: 80